{"id":2488,"date":"2024-05-23T20:08:24","date_gmt":"2024-05-23T19:08:24","guid":{"rendered":"https:\/\/www.lineacor.com\/en\/?p=2488"},"modified":"2024-05-23T20:13:06","modified_gmt":"2024-05-23T19:13:06","slug":"lineacors-oxidation-treatment-used-on-an-iron-and-steel-65-ton-walkway","status":"publish","type":"post","link":"https:\/\/www.lineacor.com\/en\/lineacors-oxidation-treatment-used-on-an-iron-and-steel-65-ton-walkway\/","title":{"rendered":"LINEACOR\u00b4s oxidation treatment used on an iron and steel 65-ton walkway."},"content":{"rendered":"



This construction project – a footbridge in Sabadell (Barcelona) \u2013 was a signifcant challenge for LINEACOR\u00ae<\/strong>; how to treat a 65-ton steel superstructure that was constructed using both shot-blasted sections and pure steel sections (with calamine), and to do it during the hottest days of the year!<\/p>

\"Rusty\n\t\t\t\n\t\t\t\t\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>



To avoid the summer heat, the work took place at night ensuring a cooler ambient temperature and avoiding the intense solar radiation from the sun, which would have had a detrimental impact on the results.<\/p>

<\/p>

\"Rusty\n\t\t\t\n\t\t\t\t\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>
\"Rusty\n\t\t\t\n\t\t\t\t\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>
\"Rusty<\/a><\/figure>
\"Rusty<\/a><\/figure>



The first stage took place in the workshop, focused on 6-8 meter sections, where the difficult-to-access areas were treated and following that, the treatment of the tubular pillars supporting the different sections of the bridge was carried out. Once transported to the final location, all the parts were installed and welded together, and the oxidation treatment of all the joints of the structure was completed.<\/p>